Project Identity, Location & Baseline Scope
Name and locate the project, then enter its land area and the number of units.
Initial planning information
Land unit: change it in the account menu at the top right, under Display.Project Documents & Reference Sources
Add your project documents and the planning guides you are working from.
Or paste text
To use an outline file (GeoJSON or KML), import it on the map in Step 3.
What kinds of homes, and how much land do you need?
Choose the mix of homes, from single-storey houses to apartment blocks, and set the zoning limits that apply. Land, cost and quantities follow your mix. The optional planner can suggest three plans at different densities.
| Housing types | Share of homes |
|---|
The values for each type are generic defaults, not local data. Press "Edit" on a row to change its name, size, land and cost assumptions.
Zoning limits
Streets, sidewalks and utility corridors, and green space, are each a share of the whole site. Together with the buildings they make up the land you need.
The default shares follow UN-Habitat guidance: streets at least 30% of the land, and 15-20% for open public space. This is guidance, not law, so check your national and local rules and edit the figures if they differ.
Public and commercial buildings
Schools, clinics, markets and similar buildings in the project. They are counted in the land you need and appear in the 3D view.
What your mix adds up to: homes, public and commercial buildings, green space, streets and services
The land and cost figures below cover all of these, within your zoning limits.
Reference standards for home size
There is no single global minimum size for permanent affordable housing. National standards differ, so check yours. Two international reference points: the UN's housing indicator (SDG 11.1.1) counts a home as overcrowded when more than three people share a habitable room, and UNHCR emergency shelter guidance is at least 3.5 m² of covered living space per person in warm climates (more in cold ones). The UN also treats housing as unaffordable when it costs more than 30% of household income.
Suggest plans at three densities (optional)
The planner tries every mix of your housing types and shows three plans: Compact (the most homes per hectare), Spacious (more land per home) and Balanced in between. It uses the zoning limits and the public and commercial buildings set above, so finish those first. You choose one, or ignore it and set the mix yourself.
More limits (optional)
Leave a field empty for no limit.
Cost is not part of this step. Once you choose a mix, Step 2 works out what it costs and shows the rates used.
How long will it take, and what do you need to deliver on time?
The duration comes from how much factory-made components your suppliers can deliver each month, how fast crews can erect, and how long site preparation takes. Conventional building is modelled separately, so the time saving is a result, not an assumption.
Design and engineering starts at project start (month 0). Permits, financing and supplier set-up all start when design ends and run side by side. Site works start when the longest of the three is finished.
Supplier and crew capacity (advanced: defaults are used until you change them)
Leave these empty to use the single supply figure above. When you fill in one or more lines, the slowest line sets the pace of the whole supply.
Starting values are generic defaults, not local data. Replace them with your suppliers' real capacity and your contractors' real pace. Design, permits, financing and supplier set-up come before site works and are included in the total.
Site, climate and supply settings
The ground conditions, climate, building systems and supply chain that set the foundation type, the bill of quantities and the transport cost. The zoning limits are in Section 1.3.
Set automatically when you load terrain data in Step 3. You can change it here.
The rooftop solar share, the water treatment choice and the wall system change the quantities and cost in the bill of quantities (the 200 mm wall is priced as the thicker panel). The climate zone sets the solar yield per kWp in the sustainability card (generic defaults: highland 1.65, humid coastal 1.50, hot arid 1.85 MWh per kWp a year). Replace them with local figures.
The housing mix and the public and commercial buildings are set in Section 1.3.
The distance sets the estimated transport cost per home and the delivery time from the factory to the site. The slab span and wall system are recorded for the structural notes and the factory files.
Plan summary and zoning check
Your Step 1 plan on one page, and a check of the plan against your zoning limits. Each check shows the limit, what the plan has and where to change it. When it looks right, continue to Step 2 to check cost and affordability.
What will it cost, and can households afford it?
This is an early estimate of the construction cost: the quantities from your plan priced at default rates for the country. Set what you know about the land, the factories, the buildings and the other project costs, then enter the sale price and the household figures to test affordability. The cost of the homes is refined in Step 5 (bill of quantities). The full project cost, with phasing, financing and interest, comes in Step 6.
What does it cost to build the homes?
Edit any rate for this project. Tag each rate by how reliable it is: Generic default (unsourced; replace it with your own figure or a sourced one to narrow the range), Estimate (sourced) or Vendor-confirmed. The prices of the factory components are in Step 5.
Streets and utilities on the site: who provides them, and who pays?
In some places the municipality provides the streets, water, sewers and power, and in others the developer must build and pay for them. Choose what applies here.
A utility that others pay for costs the project nothing, but its amount is still shown in the cost table for information. The selection above applies to the streets and access roads.
| Cost item | Basis | Rate | Data status | Expected | Low – high |
|---|
Who builds the public and commercial buildings, and what do they cost?
The buildings and their sizes are set in Section 1.3. Here, choose for each one whether the project builds it, so its cost is included, or whether it only takes up land because others build it, for example the municipality.
What else does the project pay for?
Management, design, permits, supervision, contingency and the contractor's margin are shown here, each as a percentage of the direct construction cost. Edit any of them, and tag how reliable it is. Add your own items below if something project-related is missing.
| Cost item | Basis | Rate | Data status | Expected | Low – high |
|---|
Your own cost items
For costs not listed above, for example an environmental study, community consultation, insurance or legal fees. These are project costs outside construction cost, so they do not enter the savings comparison. They are included in the all-in cost and in the funding plan.
What is the all-in cost of the project?
Construction of the homes, plus the public and commercial buildings the project builds, the land it pays for, the factory set-up and your own cost items. Buildings that others build only take up land and add no cost.
| Cost item | Basis | Amount |
|---|
Who buys the homes, and at what price?
The margin is a result of the price. Choose how the homes are sold. The same price feeds the affordability test below and the sales value in Step 5.
The affordability test uses the price households pay. If you leave it empty, households pay the contract price.
Can the target households afford these homes?
Enter what households earn and how the homes will be financed. The planner shows the monthly payment, the share of households who can afford it, and the subsidy needed to close any gap. Amounts are in USD.
The starting values are generic defaults, not local data. Replace them with your country's household income survey and mortgage terms.
The price households pay is set in Section 2.6, together with the revenue to the developer.
By housing type
| Housing type | Price | Monthly payment | Income needed | Households who can afford it | Verdict |
|---|
Live Satellite GIS Mapping, Geodesic Parcel Tracing & Civil Earthworks (New Horizon Technopolis)
Locate any site globally, trace a 4-point custom parcel boundary on live satellite imagery, and inspect ISO 1,200mm block footprints and civil earthworks.
Parcel Zoning & Infrastructure
Interactive 3D Master Plan & Structural Engineering Twin
Orbit 360° (Left-Drag), Zoom (Scroll), Pan (Right-Drag), toggle Structural X-Ray Cutaway, or inspect individual blocks.
Block B-01 (G+5 Mid-Rise)
Bill of Quantities (BOQ) & Final Cost
Automated quantity take-off across all 6 Master Component Families for the active project.
Savings vs. conventional construction
Goal: 30% or more on cost and waste. Time and affordability are shown with the results in Steps 2 and 6, once the phases are set.
How these numbers are calculated (edit the assumptions to match your market)
Cost compares the bottom-up final cost (table below, each line tagged by data status) with the conventional cost per m² set in the Admin Console. Waste is a planning assumption, not a measurement. Replace them with benchmarks from your own market before presenting results to a funder.
How the final cost is built
These are the rates the cost is built from. To change a rate or its reliability tag, go to Step 2, Sections 2.1 to 2.4.
| Cost item | Basis | Rate | Data status | Expected | Low – high |
|---|
The priced list of the factory component types only. The rest of the cost (site works, erection and finishing, lifts, public buildings, land, factory set-up, design, permits and contingency) is in Section 5.2.
| Family | SKU Code | Component Name & Specification | Project Quantity | Price source | Unit Rate | Total Line Cost |
|---|
How will the project be funded, and what will it earn?
Set how the project earns money and what it pays, choose how it is funded and phased, then see the cash needed, the results and the financial statements. Everything starts from the cost and price you set in Steps 2 and 5.
Your project pack, ready to download
Each document opens as a clean file you can print or save as PDF. All figures come from the project as it is now.
What has to be purchased, from whom, and when to order it
Built from your bill of quantities, the supplier prices in Step 2 and the phases in Step 6. Lead times are planning defaults: replace them with what your suppliers confirm.