Low-Cost Housing Planning Tool
Active projects (up to 4):
Project steps:

Section 1.1

Project Identity, Location & Baseline Scope

Name and locate the project, then enter its land area and the number of units.

Initial planning information

Land unit: change it in the account menu at the top right, under Display.
Optional constraint

Gross Parcel Land Area (m²)
6.50 Hectares Typed by you
Target number of homes
155 Units / Hectare Typed by you
Section 1.2

Project Documents & Reference Sources

Add your project documents and the planning guides you are working from.

Project documents Add a project brief, zoning rules or other planning documents (PDF, TXT or CSV). Values found are shown for you to confirm. Nothing changes until you do.
Or paste text

To use an outline file (GeoJSON or KML), import it on the map in Step 3.

Planning guides List the planning guides this project follows, such as a zoning bylaw or a building code. They are kept with the project as a record. They do not change any number yet.
Add a guide
Need to find one? These open a web search in a new tab.
Section 1.3 · Homes, zoning limits & public buildings

What kinds of homes, and how much land do you need?

Choose the mix of homes, from single-storey houses to apartment blocks, and set the zoning limits that apply. Land, cost and quantities follow your mix. The optional planner can suggest three plans at different densities.

Housing typesShare of homes

The values for each type are generic defaults, not local data. Press "Edit" on a row to change its name, size, land and cost assumptions.

Zoning limits

Zoning limits From your local rules
Max site coverage 38%
Max floor-area ratio 2.2
Max height G+5 (6F)
20%
30%

Streets, sidewalks and utility corridors, and green space, are each a share of the whole site. Together with the buildings they make up the land you need.

The default shares follow UN-Habitat guidance: streets at least 30% of the land, and 15-20% for open public space. This is guidance, not law, so check your national and local rules and edit the figures if they differ.

Public and commercial buildings

Schools, clinics, markets and similar buildings in the project. They are counted in the land you need and appear in the 3D view.

What your mix adds up to: homes, public and commercial buildings, green space, streets and services

The land and cost figures below cover all of these, within your zoning limits.

Reference standards for home size

There is no single global minimum size for permanent affordable housing. National standards differ, so check yours. Two international reference points: the UN's housing indicator (SDG 11.1.1) counts a home as overcrowded when more than three people share a habitable room, and UNHCR emergency shelter guidance is at least 3.5 m² of covered living space per person in warm climates (more in cold ones). The UN also treats housing as unaffordable when it costs more than 30% of household income.

UN indicator 11.1.1 · UNHCR shelter guidance

Suggest plans at three densities (optional)

The planner tries every mix of your housing types and shows three plans: Compact (the most homes per hectare), Spacious (more land per home) and Balanced in between. It uses the zoning limits and the public and commercial buildings set above, so finish those first. You choose one, or ignore it and set the mix yourself.

More limits (optional)

Leave a field empty for no limit.

Cost is not part of this step. Once you choose a mix, Step 2 works out what it costs and shows the rates used.

Section 1.4 · Delivery schedule

How long will it take, and what do you need to deliver on time?

The duration comes from how much factory-made components your suppliers can deliver each month, how fast crews can erect, and how long site preparation takes. Conventional building is modelled separately, so the time saving is a result, not an assumption.

Before site works start

Design and engineering starts at project start (month 0). Permits, financing and supplier set-up all start when design ends and run side by side. Site works start when the longest of the three is finished.

After construction
Your timeline, drawn from the inputs above

Supplier and crew capacity (advanced: defaults are used until you change them)
Foundations and structural frame, for buildings of the height set below. The wall panels do not carry load, so the frame goes up first and the panels follow it a few floors behind.
Optional: monthly supply by product line (m² of floor per month, for each supply source)

Leave these empty to use the single supply figure above. When you fill in one or more lines, the slowest line sets the pace of the whole supply.

Starting values are generic defaults, not local data. Replace them with your suppliers' real capacity and your contractors' real pace. Design, permits, financing and supplier set-up come before site works and are included in the total.

Section 1.5

Site, climate and supply settings

The ground conditions, climate, building systems and supply chain that set the foundation type, the bill of quantities and the transport cost. The zoning limits are in Section 1.3.

Site and soil ISO 14688 / EC8

Set automatically when you load terrain data in Step 3. You can change it here.

Climate and building systems Passive & Off-Grid
60%

The rooftop solar share, the water treatment choice and the wall system change the quantities and cost in the bill of quantities (the 200 mm wall is priced as the thicker panel). The climate zone sets the solar yield per kWp in the sustainability card (generic defaults: highland 1.65, humid coastal 1.50, hot arid 1.85 MWh per kWp a year). Replace them with local figures.

Supply chain and structure ISO 1,200mm Grid

The distance sets the estimated transport cost per home and the delivery time from the factory to the site. The slab span and wall system are recorded for the structural notes and the factory files.

Section 1.6

Plan summary and zoning check

Your Step 1 plan on one page, and a check of the plan against your zoning limits. Each check shows the limit, what the plan has and where to change it. When it looks right, continue to Step 2 to check cost and affordability.

All zoning checks passed
Total Built Area (GFA) 88,704 m² ISO 1,200mm Modular Grid
Land needed - Homes plus public and commercial buildings
Projected Delivery 14.5 Months Site works in parallel with factory-made components
Substructure System FND-02 Strip/Pad Foundation template from the soil profile
Active Project: New Horizon Technopolis